Risk to check
Spout size, viscosity, fill volume, leak resistance, and formula compatibility need to be confirmed before artwork locks.
Evidence needed
Map the feature to shelf-life, buyer trust, damage risk, and reorder confidence before finalizing the pack.
MOQ planning
Planning range: start around 100+ pouches per SKU for validation runs; confirm final MOQ, proof timing, and production lead time by size, material, finish, and SKU count.
Failure modes
Common failure modes include powder in the zipper, clumping from moisture, dusty seal areas, unclear serving panels, and a pouch that tips because headspace was not planned.
Quote inputs
Chew or powder, Dosage copy, Window use, Serving count