Risk to check
Spout size, viscosity, fill volume, leak resistance, and formula compatibility need to be confirmed before artwork locks.
Evidence needed
Map the feature to shelf-life, buyer trust, damage risk, and reorder confidence before finalizing the pack.
MOQ planning
Planning range: start around 100-500 pouches per SKU when materials and fitments are available; confirm MOQ, fitment availability, proof timing, and production lead time in the quote.
Failure modes
Common failure modes include leaking around the fitment, poor pour control, panel collapse after use, cap mismatch, and formula-film incompatibility.
Quote inputs
Fill volume, Viscosity, Spout, Scent system