Primary focus
dieline, barcode, claims, color, safe area, date-code, and variant hierarchy mistakes
Likely failure modes
Common failure modes include powder in the zipper, clumping from moisture, dusty seal areas, unclear serving panels, and a pouch that tips because headspace was not planned.
Material evidence
Confirm powder density, moisture sensitivity, zipper contamination risk, scoop/headspace, static or dust behavior, and whether panels leave room for nutrition or claims.
QC checks
Quality review should cover dieline fit, print proof approval, matte finish expectations, sample fill behavior, seal strength, closure or feature fit, barcode and claim placement, and ship-test notes before scaling.
Sample set
Tile Mix, Wood Repair, Craft Glue, Sample Kit
MOQ planning
Planning range: start around 100-500 pouches per SKU when materials and fitments are available; confirm MOQ, fitment availability, proof timing, and production lead time in the quote.
Quote inputs
powder dust, moisture risk, warning panel, fill weight, risk notes, sample-fill plan, approval owner, target quantity, sku count, artwork status, launch timing