Primary focus
seal strength, fill contamination, fitment placement, and handling after packing
Likely failure modes
Common failure modes include aroma loss, valve placement errors, oil marks on matte films, weak reseal behavior, and origin variants that lose hierarchy on shelf.
Material evidence
Confirm aroma barrier, valve placement, grind or whole-bean behavior, oil scuff risk, reseal needs, and how origin or roast variants change artwork panels.
QC checks
Quality review should cover dieline fit, print proof approval, matte or paper-touch finish expectations, sample fill behavior, seal strength, closure or feature fit, barcode and claim placement, and ship-test notes before scaling.
Sample set
House Blend, Single Origin, Decaf, Cold Brew Roast
MOQ planning
Planning range: start around 100+ pouches per SKU for validation runs; confirm final MOQ, proof timing, and production lead time by size, material, finish, and SKU count.
Quote inputs
roast size, valve need, grind or whole bean, sku count, risk notes, sample-fill plan, approval owner, target quantity, artwork status, launch timing