Current pack to beat
box, mailer, or generic pouch
MOQ planning
Planning range: start around 100+ pouches per SKU for validation runs; confirm final MOQ, proof timing, and production lead time by size, material, finish, and SKU count.
Evidence needed
Confirm film structure, seal strength, fill weight, closure needs, storage conditions, distribution path, and the feature set that must be validated before production.
Quality checks
Quality review should cover dieline fit, print proof approval, matte finish expectations, sample fill behavior, seal strength, closure or feature fit, barcode and claim placement, and ship-test notes before scaling.
Quote inputs
product type, sku count, artwork status, campaign timing, seal risk, barrier risk, scuffing, leaking, zipper contamination, sample-fill notes, target quantity, artwork status, launch timing