Buyer question
Artwork and dieline checklist
MOQ planning
Planning range: start around 100-500 pouches per SKU when materials and fitments are available; confirm MOQ, fitment availability, proof timing, and production lead time in the quote.
Evidence needed
Confirm formula compatibility, viscosity, fill volume, spout diameter, cap torque, headspace, leak testing, and whether the pouch needs a standing base after partial use.
Quality checks
Quality review should cover dieline fit, print proof approval, gloss finish expectations, sample fill behavior, seal strength, closure or feature fit, barcode and claim placement, and ship-test notes before scaling.
Quote inputs
formula, fill volume, warning copy, kit count, dieline size, bleed, barcode space, claims, variant copy, print-ready files, target quantity, sku count, artwork status, launch timing