Format start
High-barrier stand-up pouch
Material start
Moisture and oxygen barrier film
Current pack to beat
freeze-dried pouch or box
MOQ planning
Planning range: start around 100+ pouches per SKU for validation runs; confirm final MOQ, proof timing, and production lead time by size, material, finish, and SKU count.
Evidence needed
Confirm powder density, moisture sensitivity, zipper contamination risk, scoop/headspace, static or dust behavior, and whether panels leave room for nutrition or claims.
Quality checks
Quality review should cover dieline fit, print proof approval, matte finish expectations, sample fill behavior, seal strength, closure or feature fit, barcode and claim placement, and ship-test notes before scaling.
Quote inputs
shelf-life need, serving size, instruction panel, oxygen barrier, buyer meeting date, shelf set, sample skus, case pack, barcode, sell-in story, target quantity, sku count, artwork status, launch timing